37 Mira Mesa
Rancho Santa Margarita, CA 92688
$ 950,000
Price
3
Beds
2.5
Baths
1,778 Sq. Ft.
$534 / Sq. Ft.
39 Days On Market
Listed By William Scott (DRE# 01872856) at Regency Real Estate Brokers and Rachel Scott (DRE# 01990398) at Regency Real Estate Brokers (949-697-8795).
Have You Been Pre-Qualified? Start Now
DESIGNED LIKE A SINGLE FAMILY RESIDENCE WITH PRIVACY! Rarely does a home combine privacy, upgrades, and location this well. Tucked into the sought-after MELINDA HEIGHTS community in Sausalito, this nearly 1,800 square foot residence lives and shows like a true single-family detached home — no one behind you, ever, thanks to a private backyard with zero rear neighbors. Step inside to a bright, open-concept living space where the kitchen, dining, and living areas flow seamlessly together. The gourmet kitchen has been tastefully upgraded with sleek quartz countertops, a marble-look backsplash, stainless steel appliances including a gas range, and refined cabinetry — a true centerpiece for everyday living and entertaining alike. The adjoining dining area comfortably seats a crowd, while the open sightline to the staircase leads up to a versatile loft, perfect as a home office, media room, or additional lounge space. Outside, the private backyard is an entertainer's dream. A built-in outdoor kitchen with a full-size grill anchors the space, while a lush, professionally landscaped setting — complete with tropical greenery, flowering accents, and open views — creates a resort-like retreat right at home. Whether you're hosting a dinner party or unwinding solo under the umbrella, this backyard delivers a level of privacy and tranquility that's hard to find. A full two-car garage adds everyday convenience, and the location seals the deal — Rancho Santa Margarita's park system is one of the city's biggest draws, and this home sits close to some of the best of them, with walking trails and green space just minutes away. Homes with this combination of privacy, upgrades, and an entertainer's backyard don't last. Schedule your showing of 37 Mira Mesa today. Don't miss this one!
Last Updated: 2 days ago
Want all these details? Sign In or Join Now